Who this applies to
Scope
Workers removing ACM where wet methods are safe and suitable.
Core procedure
Four essential steps
- 01
Assess electrical, structural, slip and contamination risks before selecting wet methods.
- 02
Apply low-pressure wetting or an appropriate wetting agent without creating runoff.
- 03
Allow penetration and keep material damp while removing it as intact as possible.
- 04
Capture residue and wastewater as asbestos-contaminated waste and maintain housekeeping.
Call 027 549 5969