Encapsulation & Sealing

Who this applies to

Scope

PCBUs and competent contractors considering encapsulation instead of removal.

Core procedure

Four essential steps

  1. 01

    Confirm the ACM is suitable to remain in place and assess condition, access and future disturbance.

  2. 02

    Select a compatible system and prepare the surface without uncontrolled fibre release.

  3. 03

    Apply and inspect the system in accordance with the documented method.

  4. 04

    Label, register, monitor and maintain the encapsulated ACM, with clear removal triggers.